Concrete Trenching in Barrie for New Plumbing Lines
Our team successfully completed a concrete trenching project in Barrie for the installation of new sewer and plumbing lines inside a future café unit. The total length of the trench reached approximately 300 linear feet, with cutting depths ranging from 3 to 6 inches. Before starting the concrete cutting, we performed a GPR concrete scan to detect and avoid any existing electrical lines, especially near the main electrical panel. This ensured full safety and accuracy during the work. The project involved diamond floor sawing with water cooling to minimize dust and noise, followed by concrete removal and site cleanup. All cut concrete was safely disposed of. Thanks to precise planning and coordination, the work was completed on time, and the client (Exclusive Plumbing) was very satisfied. The plumbing team can now proceed with pipe installation on a clean, prepared base.