drm logo

Road Sawing in Scarborough: 200 Linear Feet of Asphalt

A food-additive manufacturing facility in Scarborough needed a strip of asphalt around the building separated from the surrounding pavement before removal. DRM Cutting’s scope was cut only: make the perimeter cuts so the customer’s crew could break out the asphalt and prepare the area for new paving.

How we cut the asphalt

The existing asphalt was approximately 4–5 inches thick. We used a water-fed walk-behind saw to complete 200 linear feet of cuts around the building. The cutting work took about 90 minutes.

For asphalt work like this, road sawing establishes a clean edge between the strip being removed and the pavement that will stay in place. The photos show the marked route, the water-fed saw in use, and the cut line before the customer’s crew began breaking out the asphalt.

What the customer handled

Once the cuts were complete, the customer’s crew used a Bobcat to break out the asphalt and handled haul-out and replacement paving separately. Those steps were not part of DRM’s scope.

See our floor and pavement sawing services for other commercial cutting applications.

Road sawing on site

Marked route, wet sawing in progress, and the finished cut line before asphalt removal.

services works 0
services works 1
services works 2
services works 3

Frequently Asked Questions

Road sawing makes straight cuts in pavement to separate a section before it is broken out. It can be used on access roads, parking lots and commercial drive lanes.

No. A walk-behind road saw can also cut asphalt on private commercial and industrial sites. This job was on the pavement around a manufacturing building in Scarborough.

The asphalt was approximately 4–5 inches thick. For a new job, tell us the pavement thickness if you know it, and flag any concrete beneath the asphalt.

Water cools the diamond blade and helps control airborne dust during cutting. Wet cutting also creates slurry, so site drainage and cleanup requirements should be discussed before work starts.

DRM cut about 200 linear feet in approximately 90 minutes on this site. Timing on another site depends on pavement thickness, access and the cut layout.

Yes. This was a cut-only job. The customer’s crew handled breakout with a Bobcat, haul-out and replacement paving separately.

Send the site location, approximate cut length and depth, a photo or marked-up drawing, and any access or scheduling restrictions. Let us know whether you need cutting only.

Confirm the cut lines and depth with the site team. Identify any utilities or other features that could be affected, and arrange locates where required before cutting starts.