DRM Cutting ran a field test of its new hydraulic wire saw at Scarborough Disposal’s (SDL) waste-handling yard in Scarborough, Ontario. This was an equipment trial, not a client demolition job. We chose a large concrete block to put the saw and its wire accumulator through one complete cut under real yard conditions.

Hydraulic concrete wire saw and wire accumulator beside concrete blocks at the SDL test yard in Scarborough


Why we cut the block diagonally

The crew chose a diagonal across the block rather than a shorter cut straight across it. On this block, that gave the wire a larger surface to cut through. The guide pulley and the wire are visible in the setup photo, giving a better sense of the cut path than a close-up of the finished face alone.

Guide pulley and wire routed around the concrete test block at the SDL yard


The cut took about an hour

The hydraulic saw pulled the wire through the block while the accumulator took up wire as the cut progressed. The close-up shows the wire where it meets the concrete. The cut took about an hour and went as planned. That timing describes this block and setup, not a production rate for other projects.

Close-up of the diamond wire at the edge of the concrete test block


The result: two sections and a visible diagonal face

The block came apart along the planned cut. The final photo shows the two exposed faces next to the original rough exterior, making the diagonal easy to see. The trial confirmed that the new saw and accumulator could complete this cut together. It was a practical equipment check before putting the setup to work on other concrete wire sawing jobs.

Two sections of the concrete block showing the finished diagonal wire-saw cut


Frequently Asked Questions

At SDL’s waste-handling yard in Scarborough, Ontario.

No. DRM Cutting ran the trial to test its new hydraulic wire saw.

A hydraulic wire saw with a wire accumulator. The photos also show a guide pulley at the block.

On this block, a diagonal gave the crew a larger surface to cut through than the shorter route.

About an hour for this setup. That is not an estimate for another block or job.

It takes up wire as the cut progresses and the working loop gets shorter.

Send drawings or photos, the dimensions and material, the intended cut line, and any access or handling constraints.