drm-logo
(647) 558-8505
Get in touch

What if you hit a pipe or wire during the job?

What If You Hit a Pipe or Wire During the Job? Concrete cutting is a precise trade—but even the most experienced crew faces the risk of encountering hidden pipes or electrical wiring beneath the slab. For property owners, contractors and facility managers in Canada and the U.S., understanding how to prevent utility strikes—and what happens if one occurs—is crucial for safety, schedule integrity and liability protection. H2: Why Hidden Utilities Matter • Safety Risks: Striking a live electrical conductor can cause shocks, fires or explosions. Cutting into a gas line can trigger leaks and pose serious health and fire hazards. • Project Delays: Repairing damaged utilities often requires shutting down systems, calling in specialists, and securing permits, which can translate into costly downtime. • Financial & Legal Liability: Utility damage can result in repair bills, regulatory fines and litigation. Without proper insurance and risk management, property owners or contractors could face substantial out-of-pocket expenses. H2: Proactive Measures to Eliminate the Risk 1. Comprehensive Utility Locates Before any cutting begins, we arrange professional locates through regional “Call Before You Dig” services (e.g., 811 in the U.S., Telus Alberta One-Call in Canada). Marking all known electrical, plumbing, data and gas lines on the surface is your first line of defense. 2. High-Resolution Scanning Technologies • Ground Penetrating Radar (GPR): GPR emits radio waves into the slab and maps subsurface anomalies with pinpoint accuracy. • Electromagnetic (EM) Detectors: EM scanners sense changes in magnetic fields around metallic pipes and conduits. • Concrete X-Ray Imaging: For particularly congested areas (e.g., mechanical rooms), we partner with certified radiographers to produce a real-time image of embedded utilities. 3. Reviewing As-Built Drawings & Site Plans If your facility has existing architectural or engineering drawings, we’ll compare them against on-site scan results. This dual-verification process catches undocumented sleeves, sleeves or modifications made since the original build. 4. Detailed Job Planning & Communication Once utilities are located and marked, our project managers develop a cutting plan that avoids or safely exposes any residual lines. We share this plan with your team, ensuring everyone on site—from foremen to safety officers—understands the layout and risk zones. H2: Our Protocol If a Strike Occurs Although we’ve maintained a perfect track record of zero utility strikes, we prepare for all contingencies: 1. Immediate Shutdown: At the first sign of hitting a pipe or wire, our crew halts work, secures the area and notifies on-site supervisors. 2. Damage Assessment: We bring in qualified technicians—electricians for wiring issues, plumbers for piping—to assess and repair the damage. 3. Safety & Cleanup: We follow strict lockout/tagout procedures to ensure no live circuits or pressurized lines remain. All debris is removed and the area is left safe for other trades. 4. Incident Reporting & Documentation: Our team documents the incident with photos, detailed notes and any repair invoices. This report protects property owners and contractors in the event of an insurance claim. H2: Liability Coverage & Peace of Mind We carry full commercial general liability insurance and all required workers’ compensation coverage for your jurisdiction—whether you’re in Ontario, Alberta, California or Michigan. That means if a buried utility is damaged during our work, our policy covers repair costs, regulatory fines and any third-party claims. H2: Why Choose a Professional Concrete Cutting Specialist? • Specialized Equipment & Training: From diamond-blade concrete saws to high-tech scanners, we invest in the tools that minimize risk. • Proven Safety Protocols: Our standard operating procedures exceed industry regulations in both Canada and the U.S. • Transparent Communication: You’ll receive regular updates, site scans, risk assessments and clear work schedules. • No Prior Strikes: Our spotless record is a testament to rigorous planning and execution. H2: Key Takeaways for Property Owners & Facility Managers • Never skip utility locates or scanning—undocumented trades may have run new lines since the last renovation. • Engage a fully insured, certified concrete cutting contractor with no history of utility strikes. • Insist on a detailed, site-specific cutting plan that prioritizes safety and utility protection. H2: Ready to Cut Safely? Don’t leave underground risks to chance. Contact our expert team today for a free site survey and risk assessment. We’ll walk you through our scanning process, share site-specific findings and deliver a concrete cutting plan that keeps your project on schedule—and your liabilities at bay. Phone: 1-800-CUT-SAFE (1-800-288-7233) Email: info@yourconcretecuttingpros.com Serving Canada and the United States with industry-leading safety standards.